https://doi.org/10.3390/en15020425

“The operating and maintenance costs in this work were divided into variable operating costs (VOCs) and fixed operating costs (FOCs). The economic assumptions utilised for the VOCs and FOCs are tabulated in Table 4.”

Table 4. Economic assumptions for estimating the operating costs.
Description Unit Value/Unit Reference
Annual operation Hours 8000 [43]
Steam (natural gas) EUR/ton 15.51 * [52]
Steam (excess/waste heat) EUR/ton 5.21 * [52]
Electricity EUR/kWh 0.058 [52]
Process Water EUR/m3 6.65 [52]
Cooling Water EUR/m3 0.022 Assumed
Solvent (MEA) EUR/ton 1450 [53]
Maintenance EUR 4% of TPC [43]
Engineer EUR 150,000 (1 engineer) [31]
Operators EUR 77,000 (× 20 operators) ** [52]
* Converted to EUR/ton from [52], ** Number of staff [52].